Sunday 27 May 2012

Final Evaluation


During the SDP unit I wanted to achieve some of the aspects that my CIC unit lacked, therefore I started by looking at my marking sheets from CIC to see how I could improve. The Mother Courage half of my CIC was closer to this unit than Battle for the Winds, however, something this lacked was considering the audience enough, which applies to film as the little details are definitely what matter. Having done a lot of set building for theatre I jumped at the chance to do production design for the Vampyr film. I worked on a graduate film earlier this year assisting with costumes, but was in awe of the work done by the art department; this was a perfect opportunity to try it myself.

I knew this unit was going to be a massive learning curve as this hasn’t been a project available for a costume student before, however I was determined to pull it off. I found working with the film department brilliant, the technicians were so helpful and were willing to collect props for me and spare some time to explain a few starting points. At times I felt I struggled during this project as the costume department doesn't specialise in production design, therefore I felt I didn’t have much guidance on how I could go about starting to build the set as I had never done anything like this before. I know this unit is titled self directed; however it seemed at times I was working with the film department not the costume department. However costume tutors did show their interest when they saw me and were on set, and when I did approach them with questions they were very willing to answer and help as much as they could.

I was very lucky and appreciative of two second year production designers on the film course who offered to help me during my build, having built sets before, they were able to show me how to erect the flats correctly and safely. It was also an awkward time to find a team to help me with the build as everyone I asked either had hand-ins, an extension with a lot of work to do, or were leaving to go home for summer. I managed to get a small team together, mainly consisting of film students and we got the work done, a few people did let me down, and it became clear how much longer work takes on your own to complete.

During this unit I have definitely picked up many new skills including being able to set up film flats, wallpapering and making items look real for the shot needed instead of spending a lot of money for the real item, the prime example being the four poster bed. Being on set allowed me to appreciate how much time is needed to set up lighting and frame the shot before shooting, patience is key in film, as the camera team don’t like to be rushed. Working along side a Director is also crucial in film; they are the person who makes all the final decisions above everyone else. I learnt this as the director took out the coffin from the vampire’s lair as he thought it gave a comical look to the set, this made me realise sometimes you have to take a step back and see their point of view in order to get a better result.  A moment of panic was when the extra room was added a week before filming and I had to work out how to convert the 18th century bedroom into a 2012 bedroom in a short period of time. This made me think on my feet and I had to get it right as a colour scheme was given to me and I knew the director had a certain image in his head. The director was very reassuring that he was confident in my ability to create the new set in the time given; this helped me to deliver what was asked of me.

Something which I have learnt is that you have to create a space and be aware that all of your work may not be in shot, but it is important that it is available for the camera team to use if the shot list gets changed. Continuity on set is similar to costume especially where drapes and fabric are concerned, I just remembered to always have my camera on me, and be quick to take photos in-between takes. This was also the biggest budget I have been in control of spending, I managed to keep on top of thing, and ended the project under budget, which I am proud of.

Overall this project has been so exciting I loved working as production designer on this film shoot, it was an educational experience and I have learnt so much. Working with the film department was great practice for me as they were very helpful and understanding. I would love to do a project like this again, and this has confirmed my incling that I want to work in set design and building over costume.


Friday 25 May 2012

Striking


Today was very demanding especially in the 24 degree heat, all the same , the set had to be taken down, and the studio cleared. We started with the floor tiles, and pealed off the plastic sheeting, next we took off any loose pieces of wallpaper so the flats had a cleaner feel to them. We moved onto taking tht flats apart and stacking the braces and weights. Finally all the furniture was stored into one courner, the bed dismantled and taken away and the lino rolled up. Props and materials were taken up to the costume store, and sourced props were loaded into my car. The studio was left looking clean and the remaining furniture for the Acting prop store was left in the courner ready for collected on monday.






Thursday 24 May 2012

Shooting Exterior

 Today my job was slightly less demanding however still it was crucial I did the work. I was racking sand inbetween shots to make sure footprints were covered over, and also removing any modern debree from the sand for the 18th century shots. Shells also had to be moved from a large part of the beach as the vampires had to run bare footed down to the water. I also blocked off certain areas of the beach so that we could use them later to film, I did this by simply strategically placing deck chairs and parasols where we later wanted to be.  I had a team of helpers and I felt the day went very well.








Wednesday 23 May 2012

Shooting Interiors


We started with the 18th century bedroom. I had to check for continuity of the bed sheets inbetween takes and make sure the drapes were in the correct place. Pillows also had to be moved a lot and the covers were changed in each scene to the final shot where Babooshka was dead.




Next we shot the contemporary bedroom, I managed to do the change over in under 40 minutes which was great, and allowed the camera crew and director more time for shooting. I am really pleased with how the bedroom turned out, it was just as the Director had explainned to me, and I stuck to the colour scheme well. It transformed the space completely but the bed was the incling of the same room which the Director also wanted.





Finally we ended this day with shooting the Lair, this was always going to be a demanding few hours and a patient few at that. However what we could never have predicted was the weather, and it was a scorching 24 degrees. The priortiy was to keep the actors hydrated and feeling well, and to get the ideal shots in the quickest amount of time possible. I was to watch continuity of the burning candles, and also when furniture was moved I had to mark where it needed to go back to. A key scene in the Lair was with the perfume girls, where they tipped scented oil onto Babooshka's letters, the Director was very keen on this scene being perfect, understanabley so, therefore I had to go and print some more copies of the letters for the girls to rehearse with.






Today was a massive learning curve for me, I have been on film shoots before but never doing the continuity of the set. I thouroughly enjoyed it all and am excited for tomorrow at the beach!

Monday 21 May 2012

2 Days before shooting

Today I concentrated on getting in all the main props from the Acting prop store.

  • Fireplace
  • Chair
  • Writing desk
  • Old Books
  • Candel holders
  • Boxes to make chaise - longue

This is what the set looked like a day before rehearsals







Saturday 19 May 2012

Sourcing

Today I went and bought all the new props for the 2012 bedroom :

  • 8 perfume bottles
  • Drapes to diguise the walls
  • Black vase
  • White fake flowers
  • Grey/ black bedding
  • Timbre to support the drapes

Friday 18 May 2012

Building - DAY 2

Making the bed

The image below taken from my sketchbook explains how I made the bed.




The image above is how I made the courner drapes for the bed, rouching the fabric and then staple gunning it in place.

This image shows what stage the bed had got to by the end of building day 2.

Thursday 17 May 2012

continued..


These are the floor tiles, the first year costume students previously made them, however as you can see in the first image they were very bright, I therefore dulled them down with a black glaze.

Building DAY 1

As the Lair flats were up from last night, I decided we should start papering it straight away, this was a learning curve, as I had never wall papered before, however, two friends from film who are on production design taught me the easiest way, and I was soon confident and happy with the result. During papering floor tiles were being put down with double sided tape and then washed over with a black glaze to dull down the bright colours a bit.









These images show the 3 stages of making the wall texture, first was a mid grey tone painted all over, next a lighter and darker tone were applied using cut out rollers, so a dappled sponge effect was seen. Finally an off yellow/grey tone was used in certain areas, to hightlight the room and make it look more like concrete. 



 
 
We then moved on to the other room, we errected the flats and started wallpering and painting.

Wednesday 16 May 2012

Changes made

The director made some changes to the set by adding a modern 2012 bedroom, he decided when polishing the script that this was key and it was needed to explain the storyline better. I therefore had to find ways to convert this wallpapered 18th century bedroom into a modern day room, also the time frame in which I will have to do this is not very long.




Will Young's view is the style of bedroom the director suggested I looked at, also the colour scheme as well. I need to over the weekend look for a grey bed set, modern props, maybe a vase and fake flowers, and also a way to diguise the green wallpaper. This is going to be a push for time as I am building tomorrow and only have 4 working days until shooting.

Errecting the Flats

Today I went to Film Studio 2, and started errecting the flats in preparation for the build tomorrow. It was a struggle at first to get to grips with it, however it became easier as it went on, and with the help of two second year Film students, it was done in no time. We only managed to get the Lair up today, as we are waiting for more flats from studio 3 to be brought over tomorrow. I also had to do a risk assesment form and hand it into the Film department to make sure it was all alright for building, especially with burning candels and smoke alarms.


Saturday 12 May 2012

Buying

This week I went shopping for all the materials I needed to start the build, this included:

  • Paint for bedroom Sage Green
  • Embossed wallpaper
  • Lining paper for Lair
  • Black paint
  • White paint
  • Paste
  • Paste Brushes
  • Paint Brushes
  • Rollers
  • Black Fur for rugs
  • Black drape fabric for curtains
  • Sanding block for rough edges on flats
  • Cushions for the Lair

I will also need to get a few more tihngs during building.

Friday 4 May 2012

Meeting with the Director

After meeting with the Director a few alterations were made to my design, he informed me that most shots would be from mid to tight therefore I decided to cut the dressing table from my design as it wouldn't be seen and it would be a waste of my budget for very little screen time if any. Originally I had the writing desk to the left hand side of my Lair, the director liked the idea of fake windows with big black drapes infront, withthe desk there, to excentuate the fact vampires can't be in day light. He also mentioned he wanted a boudoir area, so I moved the fireplace to the left hand side where the desk originally was and then I have designed an area with rugs and cushions for the vampires to lie down. Around the bed the director suggested having a see through, chiffon or organza fabric so that some shots could be taken through this. Overall he seemed pleased with the way my work was heading, and he trusted my opinion. I am now happy to carry on and the I understand why the changes were made, they will make the set look better, and the shots will be more asthetically pleasing.